Industrial optical communication solutions from TOMOR
Custom networking and fiber solutions for industry

Seismic Bracing Systems

Browse technical resources about industrial optical communication, fiber switches, Ethernet over fiber, and networking solutions.

  • New Zealand cable tray seismic bracing customization company

    New Zealand cable tray seismic bracing customization company

    We design, supply, and install seismic bracing, isolation systems, and anchoring solutions for racks, containment, cable trays, and all critical infrastructure—minimising the risk of damage and downtime during seismic events. At Multistrut, we specialise in the manufacture and supply of Electrical and Mechanical support systems built for New Zealand conditions. With over 25 years of experience in the industry, our team understands what contractors, engineers, and installers need to get the job done right — first time. Vent Supply is a reliable distributor of V. Lock Global's seismic bracing and suspension systems. Contact us today to discover more about Vent Supply's Seismic Cable. Combining push-fit technology with a one-step lock to create a fast and secure method to anchor or brace structures, the Lockable Plus is a simple way to quickly secure a catenary span and is easily installed in under one minute. Our seismic solutions are specifically engineered to meet or exceed local building codes, seismic standards, and best practices, providing the highest level of protection for your data centre assets.

    [PDF Version]
  • Energy-saving pricing for off-grid energy storage battery cabinet systems

    Energy-saving pricing for off-grid energy storage battery cabinet systems

    In 2025, the typical cost of commercial lithium battery energy storage systems, including the battery, battery management system (BMS), inverter (PCS), and installation, ranges from $280 to $580 per kWh. Larger systems (100 kWh or more) can cost between $180 to $300 per kWh. Drawing on industrial benchmarks and. Ember provides the latest capex and Levelised Cost of Storage (LCOS) for large, long-duration utility-scale Battery Energy Storage Systems (BESS) across global markets outside China and the US, based on recent auction results and expert interviews. All-in BESS projects now cost just $125/kWh as. BNEF's global benchmark costs for solar, onshore wind and offshore wind costs all rose in 2025, reversing the downward trend seen in recent years, due to a combination of supply chain constraints, poorer resource availability and market reforms in mainland China.

    [PDF Version]
  • ADSS optical cable OM3 for power systems

    ADSS optical cable OM3 for power systems

    Bynet ADSS Optical Fiber Cable is designed for aerial deployment along power lines and other self-supporting applications where no metallic components are desired. It is used by electrical utility companies as a communications medium, installed along existing overhead transmission. AFL-ADSS® (All-Dielectric Self-Supporting) cable is ideal for installation in distribution as well as transmission environments, even when live-line installations are required. Flex-Span ADSS expands on AFL's single jacket ADSS portfolio. Flex-Span designs are optimized for a broader combination of. Aerial Outdoor All-dielectric self-supporting (ADSS) fiber optic cables Fiber Type: ITU G652D,G657A,OM1,OM2,OM3,OM4; Fiber Count:2-432 Fibers Span: 200M, 400M, 600M, Up to 1000M; Standard: IEC 60794-4、IEC 60793、TIA/EIA 598 A; The double-jacket cable design allows for higher tensile strength with. Know why the power utilities and the telecom operators have faith in the ADSS cable. It requires no messenger wire, withstands high electric fields up to 220 kV, and supports spans from 50 m to over 1,500 m — making it.

    [PDF Version]
  • Do relay protection systems need to be calibrated annually

    Do relay protection systems need to be calibrated annually

    110 (4), ER (Electricity Regulations) 1994; any protective relay and device of an installation will need to be checked, tested and calibrated by a competent person at least once every two years, or at any time as directed by the Energy Commission. Why is protective relay testing. Settings of various relays need co-ordination. Tests are conducted by the manufacturer at manufacturer s works, and by the user at site during commissioning and periodic maintenance. Many operators carry out secondary injection annually to ensure relays that protect circuits against overloads or faults operate appropriately. If applicable, documentation is required detailing how verified protection segments overlap to ensure there is not a gap. A relay may only need to operate for a fraction of a second in its decades-long life, but that moment can prevent extensive damage, prolonged outages, and worker injury.

    [PDF Version]

More industry information

Contact Us

We Look Forward to Working with You

Contact Information

Phone +49 69 2381 5497
Address Am Hauptbahnhof 10, 60329 Frankfurt am Main, Germany

Send an Inquiry